Herauf modular site office for Surge Energy at Wainwright, Alberta
Calgary & Southern Alberta

Commercial modular buildings
for Calgary.

Prefab and modular offices, site buildings and multi-family, built complete indoors and delivered finished to Calgary and southern Alberta. Herauf Development builds multi-family in Calgary, and Herauf is opening an office in the city.

Who builds prefab and modular offices for Calgary?

Herauf Modular builds them indoors at its Zehner, Saskatchewan and Enderby, BC plants, and finishes and stages Alberta projects at its yard in St. Paul, about 490 km from Calgary by road. Offices, site buildings and multi-family are manufactured and delivered in about 16 weeks, meet or exceed CSA A277 and the National Building Code, and set in days. Herauf is opening an office in Calgary.

The full range is on the commercial modular buildings page, and what drives the price is in how much a commercial modular building costs.

By road from the St. Paul yard
490 km
NBC climate zone, Calgary
Zone 7A
Meets or exceeds
CSA A277

What is local to Calgary?

In Calgary
Herauf is opening an office in Calgary, and Herauf Development, the development arm, builds multi-family in the city.
Staged at
The St. Paul yard, about 490 km from Calgary by road (measured on OpenStreetMap road data). Buildings are made indoors at Zehner and Enderby.
Climate
The National Building Code lists Calgary at 5,000 heating degree-days, climate zone 7A, with a January design temperature of minus 30 °C and a ground snow load of 1.1 kPa. Herauf builds for zones 6 through 8.
Selling to The City
The City of Calgary advertises its bid opportunities on SAP Ariba Discovery and the Alberta Purchasing Connection (APC). Construction work needs a prequalified contractor.
Delivered in Alberta
A site office for Surge Energy at Wainwright, camp food storage near Whitecourt, NAIT's Kidney Lake field school and 20 homes for Buffalo Lake Métis Settlement.
Standard
Meets or exceeds CSA A277 and the National Building Code.

Prefab and modular offices for Calgary

A Herauf office is built complete indoors, with its walls, washroom, wiring, plumbing and heating already in it, and arrives ready to set on a skid, blocking or a foundation. For a lease lot, a yard, a construction site or a permanent business, the catalogue has three sizes to start from:

In Alberta, Herauf delivered a site office for Surge Energy at Wainwright. Layouts, washroom options and how a portable office differs from a trailer are on modular offices.

Multi-family in Calgary

Herauf Development, the development arm of Herauf, builds multi-family in Calgary. The units are the same factory-built modules as every Herauf building, so the building goes up indoors while the foundation and services go in on the lot.

The published layouts, from a duplex and two triplexes to a twelve-plex, are on modular multi-family and infill. Landowners and developers who want to build together start at Herauf Development.

A Calgary office, and the St. Paul yard

Herauf is opening an office in Calgary. Until it opens, Calgary projects are quoted and run from the Kelowna head office, and the details will be on our locations page when it does.

The buildings themselves are made indoors at the Zehner, Saskatchewan and Enderby, BC plants, then finished and staged at the full-service yard in St. Paul, about 490 km from Calgary by road, and delivered from there. Selling to The City of Calgary goes through SAP Ariba Discovery and the Alberta Purchasing Connection, and buyers screening a supplier can go straight to procurement and supplier information.

What else do we build
for business and community?

Common questions.

Is a prefab office the same as a modular office?

Yes, in how Herauf builds them. The office is made complete indoors, with its walls, washroom, wiring, plumbing and heating in place, then delivered and set on a skid, blocking or a foundation. Moving it later is a lift, not a rebuild.

Where does The City of Calgary post its bid opportunities?

On SAP Ariba Discovery and the Alberta Purchasing Connection (APC). Construction bids need a prequalified contractor, and the City accepts prequalification forms through the year.

Does Herauf build multi-family in Calgary?

Yes. Herauf Development, the development arm, builds multi-family in Calgary. The published duplex, triplex, four-plex and larger layouts are on the multi-family page, and an infill or rental project can start with a written quote.

What climate are buildings for Calgary built for?

The National Building Code lists Calgary at 5,000 heating degree-days, which is climate zone 7A, with a January design temperature of minus 30 °C. Herauf's buildings meet or exceed CSA A277 and the National Building Code for climate zones 6 through 8.

Sources

Road distances are measured from the town of St. Paul to the centre of Calgary and rounded to the nearest 10 km. Delivered projects are from our case studies.

Tell us what the Calgary site needs.

Send the use, the address and the timeline. We come back with a written quote, usually within one business day, free and with no obligation.

Get a free quote

  • 5.0 from 11 Google reviews (as of September 2026)
  • BBB A+
  • Meets or exceeds CSA A277
Add a note about the project (optional)

A written quote, usually within one business day. No obligation.

We use your details to reply about your project, and may follow up about it by email for up to 6 months. Unsubscribe any time. See our Privacy Policy.