Herauf workforce housing units at an oil and gas camp near Fort McMurray
Fort McMurray & Wood Buffalo

Camp and site buildings
for Fort McMurray.

Workforce housing, site offices, quarters and camp storage, built complete indoors on steel skids and staged at our St. Paul yard, about 420 km south of Fort McMurray. Herauf has already convoyed workforce housing to a camp in the region.

Who supplies modular camp buildings in Fort McMurray?

Herauf Modular builds workforce housing, site offices and camp buildings indoors on steel skids, finishes and stages Alberta projects at its St. Paul yard about 420 km from Fort McMurray by road, and has convoyed workforce housing units to an oil and gas camp in the region. The units meet or exceed CSA A277 and the National Building Code.

The full range is on the commercial modular buildings page, and what drives the price is in how much a commercial modular building costs.

By road from the St. Paul yard
420 km
NBC climate zone, Fort McMurray
Zone 7B
Meets or exceeds
CSA A277

What is local to Fort McMurray?

Delivered here
Workforce housing units manufactured off-site and convoyed to an oil and gas camp near Fort McMurray, ready for crews on arrival.
Staged at
The St. Paul yard, about 420 km from Fort McMurray by road (measured on OpenStreetMap road data).
Climate
The National Building Code lists Fort McMurray at 6,250 heating degree-days, climate zone 7B, with a January design temperature of minus 38 °C and a ground snow load of 1.5 kPa. Herauf builds for zones 6 through 8.
Public tenders
Alberta municipalities, school boards, health entities and the provincial government post opportunities on the Alberta Purchasing Connection (APC).
On skids
Quarters, site offices and safety offices are built on steel skids with self-contained plumbing, electrical and HVAC, set on a gravel pad without a poured foundation and moved when the work ends.
Standard
Meets or exceeds CSA A277 and the National Building Code.

Workforce housing and camp buildings

Herauf has already built for a camp in the region: workforce housing units manufactured off-site and convoyed to an oil and gas camp near Fort McMurray, ready for crews when they arrived. The camp and site buildings in the catalogue are:

Each is built on a steel skid with its plumbing, electrical and HVAC self-contained, so it sets on a gravel pad without a poured foundation and moves to the next site when the work ends. What to put in the specification is in what to specify for workforce camp buildings, and the full camp range is on workforce camp and site buildings.

Built for zone 7B

By the building code's measure, Fort McMurray is colder than Regina, Saskatoon or Winnipeg: the National Building Code lists it at 6,250 heating degree-days, climate zone 7B, with a January design temperature of minus 38 °C. Herauf's buildings meet or exceed CSA A277 and the National Building Code for climate zones 6 through 8, and washroom buildings can be specified with heat-traced piping where they have to run all winter.

Because the building is finished indoors, the cold changes the site work, not the build. The choice between a skid and a foundation is in steel skid or foundation for a modular building.

Food storage and support buildings

Camps need more than beds. Herauf built a dedicated food storage facility for an oil and gas camp near Whitecourt, delivered directly to the site, and a food storage building alongside the dormitories at NAIT's Kidney Lake field school. Storage buildings are built to order rather than picked from a catalogue size.

Projects in the Edmonton region, and the St. Paul yard that stages Alberta work, are on commercial modular buildings in Edmonton.

Common questions.

Who supplies modular camp buildings in Fort McMurray?

Herauf Modular builds workforce housing, quarters, site offices and camp storage indoors on steel skids, and has convoyed workforce housing units to an oil and gas camp near Fort McMurray. Alberta projects are finished and staged at its St. Paul yard, about 420 km away by road.

What climate are camp buildings for Fort McMurray built for?

The National Building Code lists Fort McMurray at 6,250 heating degree-days, which is climate zone 7B, with a January design temperature of minus 38 °C. Herauf's buildings meet or exceed CSA A277 and the National Building Code for climate zones 6 through 8.

What sizes are site offices and quarters?

The published layouts are a 30' × 14' safety office with two offices, a 40' × 18' site office with a kitchenette and lunch room, and 42' × 14' on-site quarters with a bedroom, an office and two washrooms on self-contained water and waste.

Can camp buildings be moved to the next site?

Yes, when they are specified that way. A steel-skid foundation with self-contained plumbing, electrical and HVAC lets the unit be lifted and relocated when the project moves, without a poured foundation at either end.

Sources

Road distances are measured from the town of St. Paul to the centre of Fort McMurray and rounded to the nearest 10 km. Delivered projects are from our case studies.

Tell us how many, where and when.

Send the crew size, the site and the start date. We come back with a written quote, usually within one business day, free and with no obligation.

Get a free quote

  • 5.0 from 11 Google reviews (as of September 2026)
  • BBB A+
  • Meets or exceeds CSA A277

A written quote, usually within one business day. No obligation.

We use your details to reply about your project, and may follow up about it by email for up to 6 months. Unsubscribe any time. See our Privacy Policy.