
Commercial buildings
for Saskatoon, built in Zehner.
Offices, classrooms, washrooms and site buildings, built complete indoors at our 35,000 sq ft Zehner plant and trucked about 260 km to your site. Your foundation and services go in while we build, so the crew on site is there for days, not months.
Who builds commercial modular buildings for Saskatoon?
Herauf Modular builds them at its 35,000 sq ft plant in Zehner, Saskatchewan, about 260 km from Saskatoon by road, and delivers them finished. Offices, classrooms, washrooms and site buildings are manufactured and delivered in about 16 weeks, meet or exceed CSA A277 and the National Building Code, and install in days.
The full range is on the commercial modular buildings page, and what drives the price is in how much a commercial modular building costs.
- By road from the Zehner plant
- 260 km
- NBC climate zone, Saskatoon
- Zone 7A
- Meets or exceeds
- CSA A277
What is local to Saskatoon?
- Built at
- The Zehner plant, about 260 km from Saskatoon by road (measured on OpenStreetMap road data).
- Climate
- The National Building Code lists Saskatoon at 5,700 heating degree-days, climate zone 7A, with a January design temperature of minus 35 °C and a ground snow load of 1.7 kPa. Herauf builds for zones 6 through 8.
- Public tenders
- Saskatchewan ministries, school divisions, health bodies, municipalities and Crowns post public competitions on SaskTenders. Browsing is open; downloading documents takes a login.
- Classrooms
- The province's Relocatable Classroom Program funds relocatable classrooms that school divisions apply for every year. The 2025-26 round, $28.5 million for 39 new classrooms and two moves, includes Saskatoon, Clavet and Corman Park.
- Delivered in Saskatchewan
- A Ministry of Highways public washroom, a washroom and shower building at a Lake Diefenbaker resort, an office for Suncrest College in Yorkton, and seven projects with Zagime Anishinabek.
- Standard
- Meets or exceeds CSA A277 and the National Building Code.
Relocatable classrooms and daycares
Saskatchewan pays for relocatable classrooms through its Relocatable Classroom Program, which school divisions apply to every year. The 2025-26 round is $28.5 million for 39 new relocatable classrooms and two moves, and Saskatoon, Clavet and Corman Park are among the places it serves. Divisions post their public competitions on SaskTenders.
Classrooms go in over the summer, so a building for a Saskatoon-area school has to be finished before the school year ends, which puts the manufacturing in the winter and spring. Building indoors at Zehner is what lets that work carry on through a prairie winter. How each province funds and buys classrooms is set out in how prairie provinces buy modular classrooms.
The same line builds daycares for 30 to 47, 65 to 82 and 90 children, and modular additions to an existing building. The steps from licence to opening day are in opening a modular daycare in Saskatchewan, and the full range is on modular daycares and schools.
Offices, site offices and washrooms
For a Saskatoon business, a yard or a construction site, the catalogue has three office sizes:
- Office, 55' × 18': five offices, a boardroom and a kitchenette.
- Site office, 40' × 18': the standard office for a project site or a lease.
- Safety office, 30' × 14': two offices and storage.
An office that stays put sets on a permanent foundation; one that follows the work goes on a steel skid with its plumbing, electrical and HVAC self-contained. The sizes and the choice between skid and foundation are covered in modular office buildings: three sizes explained.
Public washroom buildings come from the same plant in nine barrier-free configurations, like the Ministry of Highways washroom and the Lake Diefenbaker resort building shown below. See modular washroom and shower buildings.
Built at Zehner, about 260 km away
Every building for Saskatoon is framed, wired and finished inside the 35,000 sq ft Zehner plant, the same plant that builds for Regina, twenty minutes to its south. Finished units are staged in the 4.5-acre yard on site, then trucked about 260 km to Saskatoon and set in days.
The Regina side of the same plant is on commercial modular buildings in Regina, and the facilities are listed on our locations page.
Delivered in Saskatchewan.

Saskatchewan
Saskatchewan Ministry of Highways Washroom
A barrier-free public washroom built for the Saskatchewan Ministry of Highways, manufactured off-site and delivered ready to serve travellers.

Diefenbaker Lake, Saskatchewan
Glamping Resort Washroom
A modern washroom and shower facility built off-site for a lakeside glamping resort, delivered ready for the season.

Yorkton, Saskatchewan
Suncrest College Agricultural Office
A modular office for Suncrest College's agricultural program, built off-site and delivered ready to occupy.

Zagime Anishinabek, Saskatchewan
Zagime Anishinabek Residential Housing
Seven modular projects, commercial and residential, delivered in partnership with Zagime Anishinabek across southern Saskatchewan First Nations.
Floor plans for Saskatoon projects
Published layouts with the dimensions, floor area and rooms as printed in our brochures.
Offices, retail and food service
Site offices, safety offices and quarters
What else do we build
for business and community?
- Commercial modular buildings Offices, medical, institutional and industrial buildings
- Modular office buildings Offices, site offices and safety offices, on skids or foundations
- Modular daycares and schools Daycares for 30 to 90 children, classrooms and program offices
- Modular washroom and shower buildings Nine barrier-free configurations, installed in days
- Workforce camp and site buildings Quarters, site offices and camp buildings on steel skids
- Modular medical clinics and pharmacies Medical centres, first-aid units and pharmacies
- Modular multi-family buildings Duplexes to twelve-plexes, and an eight-suite complex
- Northern and remote modular buildings Delivered by road, ice road and barge
- Commercial modular buildings in Regina Built at the Zehner plant, 20 minutes from Regina
Common questions.
Who builds commercial modular buildings for Saskatoon?
Herauf Modular builds them at its 35,000 sq ft plant in Zehner, Saskatchewan, about 260 km from Saskatoon by road. Offices, classrooms, washrooms and site buildings are built complete indoors, delivered in about 16 weeks and installed in days.
How do Saskatoon-area schools get relocatable classrooms?
Through Saskatchewan's Relocatable Classroom Program. School divisions apply every year, and the 2025-26 round put $28.5 million into 39 new relocatable classrooms and two moves, including classrooms for Saskatoon, Clavet and Corman Park. Divisions post their public competitions on SaskTenders.
What climate are buildings for Saskatoon built for?
The National Building Code lists Saskatoon at 5,700 heating degree-days, which is climate zone 7A, with a January design temperature of minus 35 °C. Herauf's buildings meet or exceed CSA A277 and the National Building Code for climate zones 6 through 8.
Has Herauf built commercial projects in Saskatchewan?
Yes. A barrier-free public washroom for the Saskatchewan Ministry of Highways, a washroom and shower building for a Lake Diefenbaker glamping resort, an agricultural program office for Suncrest College in Yorkton, and seven commercial and residential projects with Zagime Anishinabek.
How long does a commercial modular building take?
Most Herauf builds are manufactured and delivered in about 16 weeks, because the site work runs while the building is finished indoors. Once a finished unit arrives, installation is measured in days.
Sources
- OpenStreetMap road data (routed with OSRM, measured October 2026), OpenStreetMap contributors
- National Building Code of Canada 2020 (Appendix C, Table C-2, and Section 9.36), National Research Council Canada
- SaskTenders, Government of Saskatchewan
- Government investment in relocatable classrooms supports students (January 7, 2026), Government of Saskatchewan
Road distances are measured from the town of Zehner to the centre of Saskatoon and rounded to the nearest 10 km. Delivered projects are from our case studies.