RTM Homes in ReginaZehner, SK
Ready to Move

RTM homes,
built for Regina.

Regina is the closest city to our plant. Ready-to-move homes are built complete in Zehner, twenty minutes northeast, then moved to your lot or acreage and set on a prepared foundation, which keeps the haul short and the schedule tight.

01

16 wks

Typical build to move-in

02

Up to 20% less

Than building on site

03

CSA A277

Meets or exceeds

04

BBB A+

Accredited since 2020

A finished Herauf ready-to-move home on a trailer, bound for Regina
Zehner, SK

Twenty minutes from the plant to your lot.

A short move means fewer permits, less escort, and less cost in transport than a house travelling from out of province. The 4.5-acre yard at Zehner holds a finished home until your site is ready, so a late foundation pour never leaves the house sitting on a road allowance.

RTM or Modular

One piece, or several.

A ready-to-move home is built as one complete house and moved to your land in a single piece. A modular home is built as finished sections and joined on your foundation, which is how we reach wider layouts than a road will carry whole.

Both are built in the same facilities, to the same code, on the same schedule. Which one suits you comes down to the size of the house and what your route can take, and that is a conversation, not a form.

Delivered in Saskatchewan

Town of Pilot Butte

A spray-park washroom and change building, ten minutes east of Regina.

See the project

Common questions.

Who builds RTM homes near Regina?

Herauf Modular builds ready-to-move homes at its 35,000 sq ft Zehner facility, about twenty minutes northeast of Regina, and moves them to lots and acreages across the region.

How far can an RTM home be moved from Regina?

Anywhere the road allows. Herauf has delivered as far as St. Theresa Point in Manitoba, roughly 700 km of it over winter ice roads, so a move within the Regina region is routine by comparison.

What has Herauf built around Regina?

Herauf delivered the accessible washroom and change building for the Town of Pilot Butte spray park, and has worked with Zagime Anishinabek on residential and commercial projects. Both are within an hour of the Zehner plant.

Do I need my foundation ready before the house arrives?

Yes, and that is the point of the parallel schedule: your foundation, power, water and septic go in while the house is being built. Our site readiness checklist lists what has to be finished before delivery day.

Still deciding between one finished house and a home built in sections? Compare modular homes in Regina, or read modular vs RTM vs manufactured.

Tell us about your land.

Send us the site, the size you have in mind and your timeline. We come back with a written quote, usually within one business day, free and with no obligation.