Aerial view of a Herauf modular camp among northern forest
Workforce, Camp & Remote Sites

Camp and site buildings,
ready for the crew.

Workforce housing, quarters, site offices, washrooms and camp storage, built complete in our facilities on steel skids and set on your site in days. When the project moves, the buildings move with it.

What is relocatable workforce housing?

Relocatable workforce housing is accommodation built complete off-site on a steel skid, set on prepared ground in days without a poured foundation, and moved to the next project when the work ends. The difference from a camp trailer is that these are buildings, built to meet or exceed CSA A277 and the National Building Code, that happen to move.

Offices and other buildings on a permanent foundation are on our commercial modular buildings page.

01

56 rooms

Remote campus for NAIT

02

Days

On site, not months

03

30 to 50%

Faster than site-built

04

CSA A277

Meets or exceeds

What We Build

Everything a site needs
before work starts.

Workforce housing and dormitories

Accommodation for a project's crew, delivered complete and ready for crews on arrival, from a single unit to a full remote campus.

On-site quarters

42' × 14', with a bedroom, an office, two washrooms and self-contained water and waste.

Site and safety offices

A 40' × 18' site office for a lease, a camp or a project site, and a 30' × 14' safety office.

Washrooms and showers

Barrier-free washroom and shower buildings, on municipal services or self-contained water and sewer.

Kitchens and food storage

Kitchens are built the same way, and a dedicated food storage building serves an oil and gas camp near Whitecourt.

Industrial storage

Equipment and industrial storage buildings engineered for remote and northern sites, including one hauled to Yellowknife.

Why Modular

Buildings, built to code,
that happen to move.

Days on your lease

Units arrive complete, so crews are on site for days, not months. The building is on the production line while the site is prepared.

No poured foundation

The steel skid is the foundation. It is welded in Herauf's own shop, the unit travels on it and sets down on it, and a gravel pad and a level site are the ground work.

Moves when the project does

Plumbing, electrical and HVAC are self-contained, so when the work ends the same building is lifted onto a truck and goes to the next project.

Remote-ready

Delivered to sites across Alberta, Saskatchewan and the Northwest Territories. On a remote site the schedule advantage is larger, because trades never have to be flown in.

Common questions.

What kinds of buildings do you supply for camps and industrial sites?

Site offices, safety offices, on-site quarters with self-contained water and waste, workforce housing and dormitories, washroom and shower buildings, kitchens, and food and industrial storage. Published sizes run from 30' × 14' up to 55' × 18'.

Does relocatable workforce housing need a foundation?

No. The steel skid is the foundation. It is welded in Herauf's own shop, the unit travels on it, sets down on it on a gravel pad, and lifts off it again when the project ends.

How fast can camp buildings be set up?

Units arrive finished and are set in days. Most builds are manufactured and delivered in roughly 16 weeks, and because the building is made while the site is prepared, the approach runs 30 to 50% faster than building on site.

Have you built for oil and gas operators before?

Yes. A site office for Surge Energy at Wainwright, workforce housing at an oil and gas camp near Fort McMurray, and a food storage facility for a camp near Whitecourt, among other projects across Alberta and Saskatchewan.

Has Herauf built crew accommodation at scale?

Yes. NAIT's forestry campus at Kidney Lake in northern Alberta is a full remote campus of 14 dormitory buildings with 56 rooms and 3 classrooms, delivered to a roadless bush site.

Tell us how many, where and when.

Send the crew size, the site and the date you need to be working. We will come back with a layout, a delivery window and a written quote, usually within one business day.

Get a Free Quote