Commercial

On-Site Quarters

42' × 14', bedroom, office, 2 washrooms, self-contained water/waste

Priced by budget estimate

Area
588 sq ft (55 m²)
Size
42' × 14'

Overview

On-Site Quarters: 42' × 14', bedroom, office, 2 washrooms, self-contained water/waste. Meets or exceeds the CSA A277 standard and the National Building Code. Electric heat standard, optional solar capabilities.

From the brochure

Commercial Brochure, page 24

  • On-site
  • Quarters
  • 42' x 14'
  • 588 sq. ft.
  • Bedroom w/ Kitchenette
  • Open Office Space
  • 2 Washrooms
Length
42 ft
Width
14 ft
Area
588 sq ft (55 m²)
Product line
Commercial
Building standard
Built to meet or exceed CSA A277 and the National Building Code

Floor plan

On-Site Quarters, floor plan 1, brochure page 24

Page 24 of the Commercial Brochure. Dimensions and layouts as printed; ask us about customization.

What’s included

Brochure specifications

Commercial Brochure, page 26. As printed in the brochure.

Superior Construction

  • 1/2” plywood - under floor structure
  • Under floor structure metal cap
  • Engineered 2 x 4 roof trusses @ 24” OC
  • 2”x 4” Interior walls @ 24”OC
  • 2”x 6” exterior walls @ 16” OC
  • 2” x 10” floor Joists @16” OC
  • 3/4’’ tongue & groove subfloor
  • 7/16” wall & roof sheathing
  • Rafter hurricane ties
  • Insulation R - Value Floor R-32
  • Insulation R - Value Walls R-24
  • Insulation R - Value Roof R-60
  • 6ml vapour barrier (CGSB)

Mechanical & Plumbing

  • 30, 40 or 60 imperial gal water heater (pending use requirements)
  • Natural gas on demand water heater (optional)
  • Motion sensor / light controlled exhaust fans
  • HRV (Heat Recovery Ventilator) supply & exhaust system (optional)
  • 1 piece 4’ shower c/w glass sliding doors (shower units only)
  • 4” or 8” center set vanity sink
  • ADA compliant vanity faucets
  • Low Flow Toilet
  • Washroom Accessible grab bars (optional)
  • 5lb ABC fire extinguisher
  • Self containment System 400, 600 , 800 Gallon (optional)

Electrical

  • 100 or 200 Amp Electrical Panel (Standard)
  • Electric forced fan wall heaters, baseboard heaters & thermostats
  • 2 Exterior GFI receptacles
  • 1.5’’ Conduit Raceway to electrical panel for future electrical service
  • GFI protected receptacles in washroom
  • AFCI circuit breakers
  • 1 heat trace receptacle
  • Smoke/Carbon Monoxide alarms
  • Interior LED pot lights
  • Exterior LED lights
  • Solar Rough-in (optional)
  • Exit door and battery back up exit lights

Maintenance Free Exteriors

  • Vinyl Siding (Metal siding optional)
  • Tyvek House wrap
  • Pre-finished 12” soffit
  • Pre-finished 6” fascia
  • 36”-18 gauge primed steel insulated ext. door, expandable jamb, aluminium sill & commercial grade weatherstripping.
  • 5’’ Eavestrough & downspouts
  • Architectural Asphalt Shingles (Metal standing seam roof optional)

Interior Decor

  • Custom floating vanity cabinets, laminate countertop and Hardware
  • Commercial LVP Flooring
  • Accessible compliant vanity, mirror, towel bars & toilet paper holders
  • 4” rubber base
  • PVC wall & ceiling panels and trims (Washrooms)
  • Commercial grade door hardware, locks & passage

Warranty & Certifications

  • 1 Year comprehensive
  • 2 Year Mechanical
  • 5 Year Envelope Seal
  • Minimal site disruption
  • Fast delivery timeline
  • Meets or exceeds CSA A277
  • Electric heat
  • Optional solar

Make the On-Site Quarters yours.

Custom builds are manufactured in as little as 16 weeks once drawings, permit and engineering approval are in. Tell us about your site and we’ll prepare a budget estimate.

Submit an inquiry

  • 5.0 on Google (as of September 2026)
  • BBB A+
  • Meets or exceeds CSA A277
Add a note about the project (optional)

A reply within one business day. No obligation.

We use your details to reply about your project, and may follow up about it by email for up to 6 months. Unsubscribe any time. See our Privacy Policy.

Common questions about the On-Site Quarters

How much does the On-Site Quarters cost?

There's no fixed list price: cost depends on your finish level, site and foundation, and delivery distance. Herauf provides a no-obligation budget estimate for the On-Site Quarters tailored to your project, usually after a short qualifying call.

How long does the On-Site Quarters take to build and deliver?

Manufacturing takes as little as 16 weeks once the issued-for-construction package is signed off and permit and engineering approval are in. The On-Site Quarters is built indoors to meet or exceed CSA A277 while your site work happens in parallel, so weather never stalls the schedule.

Can the On-Site Quarters be customized?

Yes. Exterior colours, cladding, and interior finishes can be tailored, and our team walks you through options when you request a budget. The floor plan and structure follow the published Commercial specification.