- Area
- 600 sq ft
- Size
- 30' × 20'
Overview
Concessions: 30' × 20' and 42' × 18', with washrooms/change room. Meets or exceeds the CSA A277 standard and the National Building Code. Electric heat standard, optional solar capabilities.
From the brochure
Commercial Brochure, page 10
- Concession
- 30' x 20'
- 600 sq. ft.
- Men’s Washroom
- 1 Stall, 2 Urinals
- Woman’s Washroom
- 3 Stalls
Commercial Brochure, page 11
- Concession
- 42' x 18'
- 756 sq. ft.
- Men’s Washroom
- 2 Stalls
- Woman’s Washroom
- 2 Stalls
- Barrier Free
- Change Room
- Length
- 30 ft
- Width
- 20 ft
- Area
- 600 sq ft
- Product line
- Commercial
- Building standard
- Built to meet or exceed CSA A277 and the National Building Code
Floor plan


Page 10 of the Commercial Brochure. Dimensions and layouts as printed; ask us about customization.
What’s included
Brochure specifications
Commercial Brochure, page 26. As printed in the brochure.
Superior Construction
- 1/2” plywood - under floor structure
- Under floor structure metal cap
- Engineered 2 x 4 roof trusses @ 24” OC
- 2”x 4” Interior walls @ 24”OC
- 2”x 6” exterior walls @ 16” OC
- 2” x 10” floor Joists @16” OC
- 3/4’’ tongue & groove subfloor
- 7/16” wall & roof sheathing
- Rafter hurricane ties
- Insulation R - Value Floor R-32
- Insulation R - Value Walls R-24
- Insulation R - Value Roof R-60
- 6ml vapour barrier (CGSB)
Mechanical & Plumbing
- 30, 40 or 60 imperial gal water heater (pending use requirements)
- Natural gas on demand water heater (optional)
- Motion sensor / light controlled exhaust fans
- HRV (Heat Recovery Ventilator) supply & exhaust system (optional)
- 1 piece 4’ shower c/w glass sliding doors (shower units only)
- 4” or 8” center set vanity sink
- ADA compliant vanity faucets
- Low Flow Toilet
- Washroom Accessible grab bars (optional)
- 5lb ABC fire extinguisher
- Self containment System 400, 600 , 800 Gallon (optional)
Electrical
- 100 or 200 Amp Electrical Panel (Standard)
- Electric forced fan wall heaters, baseboard heaters & thermostats
- 2 Exterior GFI receptacles
- 1.5’’ Conduit Raceway to electrical panel for future electrical service
- GFI protected receptacles in washroom
- AFCI circuit breakers
- 1 heat trace receptacle
- Smoke/Carbon Monoxide alarms
- Interior LED pot lights
- Exterior LED lights
- Solar Rough-in (optional)
- Exit door and battery back up exit lights
Maintenance Free Exteriors
- Vinyl Siding (Metal siding optional)
- Tyvek House wrap
- Pre-finished 12” soffit
- Pre-finished 6” fascia
- 36”-18 gauge primed steel insulated ext. door, expandable jamb, aluminium sill & commercial grade weatherstripping.
- 5’’ Eavestrough & downspouts
- Architectural Asphalt Shingles (Metal standing seam roof optional)
Interior Decor
- Custom floating vanity cabinets, laminate countertop and Hardware
- Commercial LVP Flooring
- Accessible compliant vanity, mirror, towel bars & toilet paper holders
- 4” rubber base
- PVC wall & ceiling panels and trims (Washrooms)
- Commercial grade door hardware, locks & passage
Warranty & Certifications
- 1 Year comprehensive
- 2 Year Mechanical
- 5 Year Envelope Seal
- Minimal site disruption
- Fast delivery timeline
- Meets or exceeds CSA A277
- Electric heat
- Optional solar
Similar models
All Commercial models
Brochure page
CommercialOn-Site Quarters42' × 14', bedroom, office, 2 washrooms, self-contained water/waste588 sq ft
Brochure page
CommercialEV Charging Station30' × 18', Level 3 charging room + 2 barrier-free washroom/showers540 sq ft
Brochure page
CommercialBeauty Salon40' × 18', 4 stations + colour room720 sq ft
Make the Concessions yours.
Custom builds typically deliver in roughly 16 weeks. Tell us about your site and we’ll prepare a quote, free.
Common questions about the Concessions
How much does the Concessions cost?
There's no fixed list price: cost depends on your finish level, site and foundation, and delivery distance. Herauf provides a free, no-obligation written quote for the Concessions tailored to your project, usually within one business day.
How long does the Concessions take to build and deliver?
Most Herauf builds are manufactured and delivered in roughly 16 weeks. The Concessions is built indoors to meet or exceed CSA A277 while your site work happens in parallel, so weather never stalls the schedule.
Can the Concessions be customized?
Yes. Exterior colours, cladding, and interior finishes can be tailored, and our team walks you through options when you request a quote. The floor plan and structure follow the published Commercial specification.


