EV Charging Station, exterior 1, brochure page 13
Brochure page
EV Charging Station, floor plan 1, brochure page 13
Brochure page
EV Charging Station, page 13 of the Commercial Brochure
Brochure page
Picture 1 of 3
Commercial

EV Charging Station

30' × 18', Level 3 charging room + 2 barrier-free washroom/showers

Priced by written quote

Area
540 sq ft
Size
30' × 18'

Overview

EV Charging Station: 30' × 18', Level 3 charging room + 2 barrier-free washroom/showers. Meets or exceeds the CSA A277 standard and the National Building Code. Electric heat standard, optional solar capabilities.

From the brochure

Commercial Brochure, page 13

  • EV Charge
  • Station
  • 30' x 18'
  • 540 sq. ft.
  • 2 Washrooms/Showers
  • Barrier Free
Length
30 ft
Width
18 ft
Area
540 sq ft
Product line
Commercial
Building standard
Built to meet or exceed CSA A277 and the National Building Code

Floor plan

EV Charging Station, floor plan 1, brochure page 13
Brochure page

Page 13 of the Commercial Brochure. Dimensions and layouts as printed; ask us about customization.

What’s included

Brochure specifications

Commercial Brochure, page 26. As printed in the brochure.

Superior Construction

  • 1/2” plywood - under floor structure
  • Under floor structure metal cap
  • Engineered 2 x 4 roof trusses @ 24” OC
  • 2”x 4” Interior walls @ 24”OC
  • 2”x 6” exterior walls @ 16” OC
  • 2” x 10” floor Joists @16” OC
  • 3/4’’ tongue & groove subfloor
  • 7/16” wall & roof sheathing
  • Rafter hurricane ties
  • Insulation R - Value Floor R-32
  • Insulation R - Value Walls R-24
  • Insulation R - Value Roof R-60
  • 6ml vapour barrier (CGSB)

Mechanical & Plumbing

  • 30, 40 or 60 imperial gal water heater (pending use requirements)
  • Natural gas on demand water heater (optional)
  • Motion sensor / light controlled exhaust fans
  • HRV (Heat Recovery Ventilator) supply & exhaust system (optional)
  • 1 piece 4’ shower c/w glass sliding doors (shower units only)
  • 4” or 8” center set vanity sink
  • ADA compliant vanity faucets
  • Low Flow Toilet
  • Washroom Accessible grab bars (optional)
  • 5lb ABC fire extinguisher
  • Self containment System 400, 600 , 800 Gallon (optional)

Electrical

  • 100 or 200 Amp Electrical Panel (Standard)
  • Electric forced fan wall heaters, baseboard heaters & thermostats
  • 2 Exterior GFI receptacles
  • 1.5’’ Conduit Raceway to electrical panel for future electrical service
  • GFI protected receptacles in washroom
  • AFCI circuit breakers
  • 1 heat trace receptacle
  • Smoke/Carbon Monoxide alarms
  • Interior LED pot lights
  • Exterior LED lights
  • Solar Rough-in (optional)
  • Exit door and battery back up exit lights

Maintenance Free Exteriors

  • Vinyl Siding (Metal siding optional)
  • Tyvek House wrap
  • Pre-finished 12” soffit
  • Pre-finished 6” fascia
  • 36”-18 gauge primed steel insulated ext. door, expandable jamb, aluminium sill & commercial grade weatherstripping.
  • 5’’ Eavestrough & downspouts
  • Architectural Asphalt Shingles (Metal standing seam roof optional)

Interior Decor

  • Custom floating vanity cabinets, laminate countertop and Hardware
  • Commercial LVP Flooring
  • Accessible compliant vanity, mirror, towel bars & toilet paper holders
  • 4” rubber base
  • PVC wall & ceiling panels and trims (Washrooms)
  • Commercial grade door hardware, locks & passage

Warranty & Certifications

  • 1 Year comprehensive
  • 2 Year Mechanical
  • 5 Year Envelope Seal
  • Minimal site disruption
  • Fast delivery timeline
  • Meets or exceeds CSA A277
  • Electric heat
  • Optional solar

Make the EV Charging Station yours.

Custom builds typically deliver in roughly 16 weeks. Tell us about your site and we’ll prepare a quote, free.

Get a free quote

  • 5.0 from 11 Google reviews (as of September 2026)
  • BBB A+
  • Meets or exceeds CSA A277

A written quote, usually within one business day. No obligation.

We use your details to reply about your project, and may follow up about it by email for up to 6 months. Unsubscribe any time. See our Privacy Policy.

Common questions about the EV Charging Station

How much does the EV Charging Station cost?

There's no fixed list price: cost depends on your finish level, site and foundation, and delivery distance. Herauf provides a free, no-obligation written quote for the EV Charging Station tailored to your project, usually within one business day.

How long does the EV Charging Station take to build and deliver?

Most Herauf builds are manufactured and delivered in roughly 16 weeks. The EV Charging Station is built indoors to meet or exceed CSA A277 while your site work happens in parallel, so weather never stalls the schedule.

Can the EV Charging Station be customized?

Yes. Exterior colours, cladding, and interior finishes can be tailored, and our team walks you through options when you request a quote. The floor plan and structure follow the published Commercial specification.