Buying Guide
For anyone buying a modular or ready-to-move home: the week-by-week timeline, financing, insurance, what comes standard, and how homes travel from the Enderby, Zehner and St. Paul sites.
5 posts

Modular Homes in BC, Built at Enderby
Built indoors at the 50,000 sq ft Enderby plant, coordinated from Kelowna and hauled whole to sites from the Okanagan to Nelson. The code, the route and the timeline.
Read more
Insuring a Modular Home in Canada
On its foundation a modular home is insured like any house. The questions are the weeks before that: the build, the move and set day. What to ask your broker, and when.
Read more
How Fast Is Modular Construction, Week by Week
Manufacturing in as little as 16 weeks once drawings, permit and engineering approval are in, up to 50% faster overall, because two timelines run at once. Here is where each week goes and what actually slows a build.
Read more
RTM Home Standard Features: What Is Included
Construction that meets or exceeds CSA A277, an envelope energy-modelled for climate zones 6 to 8, triple-pane windows and electric heat come standard. The finishes are yours to choose.
Read more
Financing a Modular Home in Canada: How It Actually Works
A modular home on a permanent foundation is mortgaged like any other house. Here is the financing path step by step, and how a shorter build changes the math.
Read more