All Articles
Modular Construction

Modular Medical Clinics and Pharmacies

H

By

Published

A modular building on a paved lot, fronted by a wood and steel wheelchair ramp with handrails

A modular medical clinic is a clinic building built as finished sections inside a factory, then delivered to its site and set in days on a permanent foundation or a steel skid. Herauf's published commercial catalogue includes a 55' × 18' medical centre with three exam rooms, an 18' × 14' first-aid unit and a 50' × 18' pharmacy with a secure vault, each meeting or exceeding CSA A277 and the National Building Code.

Every commercial building Herauf makes, and the projects already delivered, is on the commercial modular buildings page, with a quote form for your site. The individual layouts are listed in the commercial catalogue. This article is the medical and pharmacy part of that range: the sizes, how the building sits on the ground, and how long it takes.

What sizes are the medical and pharmacy buildings?

Four layouts in the catalogue are built for health and care:

  • Medical centre, 55' × 18'. Three exam rooms.
  • First-aid unit, 18' × 14'. A compact unit alongside the medical centre layout.
  • Pharmacy, 50' × 18'. A retail pharmacy with a secure vault.
  • Wellness centre, 80' × 36'. A 2,880 sq ft gym with change rooms, the largest building in the catalogue.

Each one is a proven layout, not a fixed product. It is the starting point, then changed to suit the operator, which is covered in what you can change on a custom prefab building.

Skid or foundation: which does a clinic need?

It depends on whether the clinic will ever move. A clinic serving a work site or a temporary need can be built on a steel skid with self-contained plumbing, electrical and HVAC, so it can be lifted and relocated when the need moves. A clinic meant to stay where it is sets on a permanent foundation. Decide at the start, because a building is relocatable when it is specified that way from the beginning.

What code is a modular clinic built to?

Each unit meets or exceeds CSA A277 and the National Building Code for climate zones 6 through 8, and is inspected at every stage of production. Electric heat comes standard and solar is optional. What the A277 standard covers, and what your local building official still inspects on site, is explained in what CSA A277 means for your build.

A pharmacy has one more party to satisfy: the body that licenses it. Check what your provincial pharmacy regulator expects of the premises, the dispensary and the secure storage before the layout is fixed, so the changes are made on paper rather than on site.

How long does a modular clinic take?

About 16 weeks from order to delivery for most builds, up to 50% faster than conventional construction. The time comes from running two jobs at once: your foundation and services go in while the building is framed, wired and finished indoors, where weather cannot stop the work. Once it arrives, installation takes days. The week-by-week breakdown is in how fast modular construction is.

Has Herauf built for health and community services?

Herauf built the St. Theresa Point child and family services office in Winnipeg, manufactured off-site and delivered complete, and the wider list of community, institutional and industrial buildings is on the commercial page. Eligible new builds, including municipal, First Nations and private projects, can apply for the $15,000 Infrastructure Grant.

How to get a quote

Send the use, the rough size and the site through the commercial quote form, or call 1.639.382.4106. Herauf comes back with a written quote, usually within one business day, with no obligation.

Common questions

What is a modular medical clinic?

A clinic building built as finished sections inside a factory, then delivered and set in days on a permanent foundation or a steel skid. Herauf's published medical centre is 55' × 18' with three exam rooms, and it meets or exceeds CSA A277 and the National Building Code for climate zones 6 through 8.

Does Herauf build modular pharmacies?

Yes. The commercial catalogue includes a 50' × 18' pharmacy with a secure vault. Like every catalogue layout, it is a proven starting point that is changed to suit the operator.

How long does a modular clinic take?

Most Herauf builds are manufactured and delivered in about 16 weeks, up to 50% faster than conventional construction, because site work runs while the building is finished indoors. Installation on site is measured in days.

Can a modular clinic be moved later?

Yes, if it is specified that way from the start. A steel-skid foundation with self-contained plumbing, electrical and HVAC lets the building be lifted and relocated; a clinic meant to stay put sets on a permanent foundation instead.

Commercial modules on the Zehner plant floor

Commercial modules on the Zehner plant floor

Ready to move forward?

Talk to our team about your modular project today.